Some photos of a new floor installed in a downstairs hallways and 2 double reception rooms in Greenwich. We also completely re plastered this room, applied new skirting boards, new wall lighting, painted and decorated the rood and placed the TV on the wall via a bracket.
The below hallway picture was taken before the trimmings were applied to the hallway.